The MR2 road in Radanovići, which connects the Luštica peninsula and the Luštica Bay resortLuštica Baywith the rest of the municipality of Tivat,was put into operationin the presence of representatives of the Municipality of Tivat, Luštica Development, and Bemax as the contractor.
The President of the Municipality of Tivat, Željko Komnenović, Luštica Development’s manager for relations with the Government of Montenegro and the local community, Marko Vukašević, and Duško Vuković from Bemax visited the newly built section together with media representatives.
Work on the MR2 road, with a total length of 800 meters, lasted 80 days. MR2 is an extension of the already built MR1 road and continues to the Luštica Bay complex in Radanovići. Luštica Development financed a 200-meter section of MR2, and the cost of the works amounted to 250,000 euros.
A representative of Luštica Development, Marko Vukašević, expressed satisfaction that this road will significantly ease traffic on the Đuraševići coast and in the center of Radanovići at the same time. He reminded that Luštica Bay is one of the largest tourism and infrastructure projects in Montenegro.

