The project has received approval from the Budva city architect to continue construction of the promenade at Jaz. The work is expected to begin this autumn.
The promenade will be about 380 m long. The total area of the works is 1,050 square meters. EUR 162,000 has been allocated for the first phase of the works, and EUR 208,000 is planned for the second.
The promenade will be paved with red slabs and equipped with street lighting and benches.

